About

Senior IT delivery & transformation

Ger Suverkropp

Professional summary

Programme and delivery leader with 25+ years in ICT and 15+ years in senior delivery roles — always in permanent employment, typically deployed on complex client or internal programmes. Comfortable in live cloud, data centre and infrastructure environments where delivery, governance and people all need steady hands.

Recent Getronics work includes the Cloud Services PMO with full accountability for programmes, projects and team, AOK ZSA technical refresh (Full infrastructure refresh, Service Documentation, ServiceNow catalogue updates, KaaS), Global DC Estate cost-savings (≈€3M annualised avoidance) and Cloud/Operations Automation.

At BT: 2 data centre builds and interim DC operations, COVID cloud compute at 98% success, Philips PIAP (signed client evaluation 9/10, including São Paulo on an extremely short lead time), and continuity-critical customer work such as St Antonius (oversaw the Groenekan DC move; guided hospital teams to migrate stacks without disruption; signed client evaluation 9/10) and Sanquin (2018–2019: network-standard upgrade and dataroom moves to Amsterdam DCs).

Working style blends hybrid Agile with PRINCE2/ITIL governance — pragmatic, multi-vendor, and focused on measurable results that stick after the assignment ends.

Continue for results, credentials and cases

Key achievements

€2.9M

Annualised cost avoidance on Getronics Global DC Estate Phase 1 (MRC €242k / YRC €2.91M) with zero impact on live services.

175

Racks ceased in 13 weeks across Colt/AtlasEdge — above the 153 maximum expected (min. 113, threshold 135), with zero impact on remaining live services; MD Operations confirmed the result exceeded expectations.

13 wks

Phase 1 cease window for the Global DC Estate cost-savings programme (Colt and AtlasEdge, ES/FR/IT/DE/UK/PT).

98%

Success rate on global COVID-19 BT Cloud Compute projects and orders under high time pressure.

2.1→1.2

PUE reduction on BT Nieuwegein data centre renewal (two new data floors) — sustainability and efficiency.

9/10

Signed St Antonius client evaluation (Apr 2016) for the Groenekan DC move — 'Excellent. Can and will certainly recommend Ger for similar projects.'

Credentials & tools

PRINCE2 Practitioner · ITIL Foundation · hybrid Agile with pragmatic governance.
Tools and platforms in recent delivery: ServiceNow, cloud & data-centre estates, container/KaaS environments, automation (incl. CloudBolt/Morpheus evaluations), multi-vendor coordination under live-service constraints.

Career timeline

2021 – present

Head of Cloud Programs

Getronics

Cloud Services PMO; full accountability for programmes, projects and team; worldwide infrastructure renewal; coaching senior PMs; KPI dashboards for executives; Crédit Agricole named-client delivery support (confirmed by MD Operations). Programme titles below (Global DC Estate, AOK ZSA, CMP/TOA) were delivered within this permanent role.

2025 – 2026

Automation Program Manager – AOK ZSA / Container Platform

Getronics

Multi-stream Automation Program: ServiceNow catalogue automation, KaaS container platform, HW decommissioning and security/process standardisation across Getronics, AOK and COLT under live-service constraints.

2024

Global DC Estate Cost-Savings Program Manager

Getronics

Phase 1 Global DC Estate optimisation: 175 racks ceased across Colt/AtlasEdge (ES/FR/IT/DE/UK/PT) — above the 153 maximum expected (min. 113, threshold 135) in 13 weeks; ≈€2.9M annualised cost avoidance; MD Operations confirmed the result exceeded expectations; Phase 2 ACI/OCN executed.

2025 – 2026

Senior Program Manager – CMP & TOA Business Cases

Getronics

Programme Manager for Cloud Automation (CMP) and Technical Operations Automation (TOA) business cases: CloudBolt vs Morpheus POC, board ROI/TCO, ServiceNow automation potential (~€700k INC / ~€378k SR).

2020 – 2021

Senior Project Advisor / Program Manager

BT

Delivery artefacts for managed & hybrid cloud; Cloud Solution Hub programme lead; security & technology risk governance.

2016 – 2020

Program Manager / Senior Project Manager

BT

Global COVID-19 cloud compute programmes (98% success); portfolio restructuring; feasibility studies and migration roadmaps; Signify Regional Network Hubs.

2018 – 2019

Project Manager – Sanquin (customer)

BT

Upgraded local network equipment to current technical standards; relocated datarooms to new Amsterdam data centre sites; recabled all data racks.

Mar 2016 – Sep 2016

Programme oversight – St Antonius Ziekenhuis (customer)

BT

Hired to oversee the move to DC Groenekan; guided hospital teams to migrate their stacks safely, securely and without service disruption. Signed client evaluation (Apr 2016): 9/10 — 'Excellent. Can and will certainly recommend Ger for similar projects.'

2007 – 2016

Senior Project Manager

BT

Nieuwegein DC renewal (two new data floors; PUE 2.1→1.2); Rotterdam DC build including CEVA lift-and-shift (programme manager directing the PMs; positive customer feedback); DTCC as first customer into newly built DC capacity (two data floors; PUE 1.2 — written recommendation; VP-level customer feedback); interim IT Manager Data Centre Services; full BWSE lifecycle; Philips PIAP (signed client evaluation 9/10, including São Paulo); IBM/ABN AMRO infra projects.

1997 – 2006

Project & test leadership

TAS · CMG · LogicaCMG · CTG · KPN Telecom

Telecom, transport and finance projects; Y2K; governance, PID/RACI; site management and MIS/DBA reporting; LogicaCMG QBS (€1.1M).

Selected cases

Short narratives from programmes where continuity and outcomes both mattered.

Global DC Estate Cost-Savings

Roles: Program Manager · Project Manager · Change Manager

Challenge
A multi-country rack estate (Colt/AtlasEdge; baseline around 385 racks) needed aggressive cost take-out without touching remaining live customer and internal services.
Approach
End-to-end Phase 1 programme control — weekly cease coordination across suppliers, CMDB and contractual-threshold reporting, and strict live-service constraints. Phase 2 set up ACI/OCN firewall consolidation and utilisation governance.
Results
175 racks ceased in 13 weeks (above the 153 maximum expected; min. 113, threshold 135); approximately €2.9M annualised cost avoidance (MRC ~€242k / YRC ~€2.91M) with zero impact on remaining live services. MD Operations confirmed the result exceeded expectations.
Client impact
Board-visible estate cost reduction while continuity stayed non-negotiable — proof of run-and-change under production constraints.

St Antonius Dataroom Relocation

Roles: Project Manager · Change Manager

Challenge
Move hospital stacks to DC Groenekan while clinical operations and care production could not stop.
Approach
Hired to oversee the Groenekan move based on prior data-centre experience (Mar–Sep 2016). Guided St Antonius teams to migrate their stacks safely, securely and without service disruption under live hospital constraints.
Results
Stacks migrated without service disruption. Signed client evaluation (Apr 2016): overall 9/10 — 'Excellent. Can and will certainly recommend Ger for similar projects.'
Client impact
Continuity of hospital IT underpinning care delivery — high-trust proof for healthcare and other regulated live environments.

Global COVID Cloud Compute Delivery

Roles: Program Manager · Project Manager

Challenge
Worldwide surge in BT Cloud Compute projects and orders under COVID urgency, with compressed lead times and normal delivery windows no longer applying.
Approach
As Program Manager / Senior Project Manager at BT, owned implementation and escalation management across strategic, tactical and operational stakeholders, plus portfolio restructuring for customer fit and time-to-value under COVID urgency.
Results
98% success rate on global COVID-related Cloud Compute projects and orders under shortened lead times.
Client impact
Customers got capacity when urgency peaked — reliable delivery under crisis operating conditions.

Sanquin Network Refresh & Dataroom Moves

Roles: Project Manager · Change Manager · IT Manager

Challenge
Bring Sanquin's local network estate to current technical standards and relocate datarooms to new Amsterdam data centre locations, including recabling all data racks, while healthcare operations continued.
Approach
Project delivery via BT (2018–2019) for a Dutch healthcare organisation: network-standard upgrade combined with physical dataroom moves and full rack recabling under live-service constraints.
Results
Local network equipment upgraded to current technical standards; datarooms relocated to new Amsterdam DC sites; all data racks recabled — healthcare operations continued throughout.
Client impact
Continuity-critical infrastructure change for Dutch healthcare — a second named healthcare customer alongside St Antonius.

References

Selected endorsements from sponsors and colleagues.

Excellent. Can and will certainly recommend Ger for similar projects. Overall 9/10.

Client evaluators Client evaluation (signed, Apr 2016) · St Antonius Ziekenhuis

Under very difficult circumstances, Ger managed to meet deadlines. Especially the timely delivery of São Paulo, with an extremely short lead time, contributed significantly to a positive turnaround in Philips' assessment of BT as a supplier and partner. Overall 9/10.

Client evaluator Client evaluation (signed, Mar 2008) · Philips

Contributions have not only met but exceeded our expectations.

MD Operations Written commendation (May 2024) · Getronics

A very special thanks for putting all your energy into speeding up COVID-19 related projects. I'm very proud of you.